Hello,
I want to explain specifically what I’m trying to accomplish with my crane rental service.
To bridge the gap between manual lifting, and making the decision to use a proper, alternative lifting device. The photo below shows a group that attempted to use a rolling ‘A’ frame to move a 750lb pump component into place. When the a frame tipped over and luckily didn’t hurt anyone. The problem is that customers are calling only AFTER it’s too late, and it’s a matter of time before an important member their team is no longer able to complete the same duties they could before. Training and onboarding costs are not cheap to replace an injured worker so I propose safer, and typically faster solutions to avoid having to do that